Current Project I76 Ramp Widening Contract 04-02 -zipped

In order to view the following electronic drawing files posted on this web page, you must view the page with Microsoft Internet Explorer or Netscape Navigator equipped with Autodesk Express Viewer. You can download the current version of Autodesk Express Viewer from the Autodesk website.

Wsan1.dwf Typical Sanitary Precast Manhole
Wsan2.dwf Typical Drop Manhole
Wstm1.dwf Typical Storm Precast Manhole & Catch Basin No. 3    (W.C.B. #3)
Wstm2.dwf Typical Channel Detail for Catch Basins & Manholes
Wstm3.dwf Typical Poured Invert
Wstm4.dwf Catch Basin Boxout
Wstm5.dwf Wadsworth Catch Basin No. 1-2 (W.C.B.  #1-2)
Wstm6.dwf Wadsworth Catch Basin No. 1-3 (W.C.B.  #1-3)
Wstm7.dwf Wadsworth Curb Inlet Precast Manhole
Wstm8.dwf Typical Dry Detention Basin
Wstm9U.dwf Upstream Drop Curb & Overflow Swale Detail at Sidewalk
Wstm9D.dwf Downstream Drop Curb & Overflow Swale Detail at Sidewalk
Wstm10.dwf Wadsworth Standard Headwall
Wstm11.dwf Wadsworth Standard Endwall
Wstm12.dwf Wadsworth Channel Protection
Wstm13.dwf Typical Existing Pavement Trench Section
Wstm14.dwf Typical New Pavement Trench Section
Wstm15.dwf Flexible Pipe Bedding
Wstm16.dwf Rigid Pipe Bedding
Wstm17.dwf Wadsworth Catch Basin No. 4 (W.C.B.  #4)
Wstm18.dwf Wadsworth Catch Basin No. 5 (W.C.B.  #5)
Wstm19.dwf Standard No. 2-2 & 2-3 Square Catch Basins (W.C.B.  #2-2 & #2-3)
Swstand.dwf Sidewalk Standard
Pave1.dwf Typical Pavement Section & Joints & Boxout
Waterlinenotes.dwf Waterline Notes
Watersrv.dwf Water Connection
Survey-1.dwf Subdivision Control Monument